Question

What is the main difference between the Application Composition model and the Early Design model in COCOMO 2?

a.

The Application Composition model counts Object Points while the Early Design model counts Function Points

b.

The Application Composition model is intended for prototyping efforts while the Early Design model is aimed at the architectural design stage

c.

The Application Composition model is based on counting system components of a large granularity, such as screens and reports, while the Early Design model is an FPA-like model

d.

The Application Composition model is based on counting Object Points while the Early Design model is based on counting Source Lines of Code

Posted under Software Engineering

Answer: (a).The Application Composition model counts Object Points while the Early Design model counts Function Points Explanation:The Application Composition model is based on counting the number of screens, reports, and 3GL components in the application while the Early Design model uses unadjusted function points as its basic size measure.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What is the main difference between the Application Composition model and the Early Design model in COCOMO 2?

Similar Questions

Discover Related MCQs

Q. What is the main advantage of using Object Points in the Application Composition model?

Q. How is the total effort in the Application Composition model estimated?

Q. How does the Post-Architecture model differ from the original COCOMO model?

Q. What are the differences between the COCOMO and COCOMO 2 set of cost drivers?

Q. What is the formula used to determine the exponent b in the COCOMO 2 effort equation?

Q. Can both KSLOC and UFP be used as a base measure in COCOMO 2?

Q. How is the effort estimated in the Application Composition model of COCOMO 2?

Q. How does COCOMO 2 handle reuse?

Q. What are the five scale factors used in COCOMO 2?

Q. How is reuse catered for in the original COCOMO model?

Q. How is the exponent b in the COCOMO 2 effort equation determined?

Q. How is the effort needed to determine whether a component is appropriate for the present application represented in COCOMO 2?

Q. How is the equivalent number of new lines of code calculated in COCOMO 2?

Q. What are the factors that impact the cost of reuse in COCOMO 2?

Q. What is the extra effort needed to reuse code if it is strongly modular, matches the application, and is well-documented?

Q. What is the range of the degree of assessment and assimilation (AA) in COCOMO 2?

Q. How is the equivalent kilo number of new lines of code (EKLOC) calculated in COCOMO 2?

Q. What is one of the main problems in applying cost estimation models?

Q. According to DeMarco, what is the main cause of politically-colored estimates?

Q. What is the "budget" method of cost estimation?