adplus-dvertising
frame-decoration

Question

What are the differences between the COCOMO and COCOMO 2 set of cost drivers?

a.

Four new cost drivers have been introduced, two have been dropped, and the productivity influence of some cost drivers has been increased or decreased

b.

Two new cost drivers have been introduced, four have been dropped, and the productivity influence of some cost drivers has been increased or decreased

c.

Four new cost drivers have been introduced, four have been dropped, and the productivity influence of some cost drivers has been unchanged

d.

Two new cost drivers have been introduced, two have been dropped, and the productivity influence of some cost drivers has been unchanged

Posted under Software Engineering

Answer: (a).Four new cost drivers have been introduced, two have been dropped, and the productivity influence of some cost drivers has been increased or decreased Explanation:Four new cost drivers have been introduced, two have been dropped, and the productivity influence of some cost drivers has been increased or decreased in COCOMO 2.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What are the differences between the COCOMO and COCOMO 2 set of cost drivers?

Similar Questions

Discover Related MCQs

Q. What is the formula used to determine the exponent b in the COCOMO 2 effort equation?

Q. Can both KSLOC and UFP be used as a base measure in COCOMO 2?

Q. How is the effort estimated in the Application Composition model of COCOMO 2?

Q. How does COCOMO 2 handle reuse?

Q. What are the five scale factors used in COCOMO 2?

Q. How is reuse catered for in the original COCOMO model?

Q. How is the exponent b in the COCOMO 2 effort equation determined?

Q. How is the effort needed to determine whether a component is appropriate for the present application represented in COCOMO 2?

Q. How is the equivalent number of new lines of code calculated in COCOMO 2?

Q. What are the factors that impact the cost of reuse in COCOMO 2?

Q. What is the extra effort needed to reuse code if it is strongly modular, matches the application, and is well-documented?

Q. What is the range of the degree of assessment and assimilation (AA) in COCOMO 2?

Q. How is the equivalent kilo number of new lines of code (EKLOC) calculated in COCOMO 2?

Q. What is one of the main problems in applying cost estimation models?

Q. According to DeMarco, what is the main cause of politically-colored estimates?

Q. What is the "budget" method of cost estimation?

Q. What is the "price to win" method of cost estimation?

Q. What is one of the main reasons for the lack of data collection in software projects?

Q. What is one of the main traps to be avoided when using other methods for cost estimation based on the expertise of estimators?

Q. What is the main disadvantage of politically-colored estimates?