adplus-dvertising
frame-decoration

Question

How does the Post-Architecture model differ from the original COCOMO model?

a.

It uses a different set of cost drivers

b.

It uses a different base measure

c.

It has a different range of values for the exponent b

d.

All of the above

Posted under Software Engineering

Answer: (d).All of the above Explanation:The Post-Architecture model differs from the original COCOMO model in its set of cost drivers, the use of lines of code as its base measure, and the range of values of the exponent b.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. How does the Post-Architecture model differ from the original COCOMO model?

Similar Questions

Discover Related MCQs

Q. What are the differences between the COCOMO and COCOMO 2 set of cost drivers?

Q. What is the formula used to determine the exponent b in the COCOMO 2 effort equation?

Q. Can both KSLOC and UFP be used as a base measure in COCOMO 2?

Q. How is the effort estimated in the Application Composition model of COCOMO 2?

Q. How does COCOMO 2 handle reuse?

Q. What are the five scale factors used in COCOMO 2?

Q. How is reuse catered for in the original COCOMO model?

Q. How is the exponent b in the COCOMO 2 effort equation determined?

Q. How is the effort needed to determine whether a component is appropriate for the present application represented in COCOMO 2?

Q. How is the equivalent number of new lines of code calculated in COCOMO 2?

Q. What are the factors that impact the cost of reuse in COCOMO 2?

Q. What is the extra effort needed to reuse code if it is strongly modular, matches the application, and is well-documented?

Q. What is the range of the degree of assessment and assimilation (AA) in COCOMO 2?

Q. How is the equivalent kilo number of new lines of code (EKLOC) calculated in COCOMO 2?

Q. What is one of the main problems in applying cost estimation models?

Q. According to DeMarco, what is the main cause of politically-colored estimates?

Q. What is the "budget" method of cost estimation?

Q. What is the "price to win" method of cost estimation?

Q. What is one of the main reasons for the lack of data collection in software projects?

Q. What is one of the main traps to be avoided when using other methods for cost estimation based on the expertise of estimators?