81. | During project inception the intent of the of the tasks are to determine |
Discuss |
Answer: (d).All of the above
|
82. | Three things that make requirements elicitation difficult are problems of |
Discuss |
Answer: (d).All of the above
|
83. | The result of the requirements engineering elaboration task is an analysis model that defines which of the following problem domain(s)? |
Discuss |
Answer: (d).all of the above
|
84. | The system specification describes the |
Discuss |
Answer: (a).Function, performance and constraints of a computer-based system
|
85. | The best way to conduct a requirements validation review is to |
Discuss |
Answer: (d).use a checklist of questions to examine each requirement
|
86. | The use of traceability tables helps to |
Discuss |
Answer: (c).identify, control, and track requirements changes
|
87. | Which of the following is not one of the context-free questions that would be used during project inception? |
Discuss |
Answer: (b).Who is against this project?
|
88. | In collaborative requirements gathering, the facilitator |
Discuss |
Answer: (c).controls and facilitates the process
|
89. | Which of the following is not one of the requirement classifications used in Quality Function Deployment (QFD)? |
Discuss |
Answer: (c).mandatory
|
90. | The work products produced during requirement elicitation will vary depending on the |
Discuss |
Answer: (b).size of the product being built
|