42. | Which of these software characteristics are used to determine the scope of a software project? |
Discuss |
Answer: (c).Information objectives, function, performance
|
43. | Which of the following is/are considered stakeholder in the software process? |
Discuss |
Answer: (d).All of the above
|
44. | Which Variation control in the context of software engineering involves controlling variation? |
Discuss |
Answer: (d).All mentioned above
|
45. | What is the main aim of Software engineering? |
Discuss |
Answer: (c).Reliable and cost effective software
|
46. | Choose the correct option according to the given statement. Statement 1: Software is a physical rather than a logical system element. Statement 2: Computer software is the product that software engineers design and build. Statement 3: Software is a logical rather than a physical system element. Statement 4: Software is a set of application programs that are built by software engineers. |
Discuss |
Answer: (c).Statement 2 and 3 and 4 are correct.
|
47. | An effective project manager define a competent manager must reward Initiative and accomplishment to optimize the productivity of a project team is ______ . |
Discuss |
Answer: (c).Achievement
|
48. | In the management subsystem what is the functional elements and associated workflow will support the content object identification, version control, change management, change auditing and reporting? |
Discuss |
Answer: (c).Configuration management function
|
49. | Abbreviate the term ILFs. |
Discuss |
Answer: (b).Internal logical files
|
50. | What is a special set of ISO guidelines that developed to help the interpret standard for the use in software process? |
Discuss |
Answer: (c).ISO 9000-3
|