72. | A feasibility study |
Discuss |
Answer: (b).includes a statement of the problem
|
73. | The combination of the top-down and the bottom-up approach may be referred to as an |
Discuss |
Answer: (b).integrative approach
|
74. | System prototyping helps the designer in |
Discuss |
Answer: (c).communicating to the user, quickly, how the system, when developed, will look like and get the feedback
|
75. | Mistakes made in the system analysis stage show up in |
Discuss |
Answer: (b).implementation
|
76. | Which of the following is not true of the conversion phase of the development life cycle? |
Discuss |
Answer: (a).Documentation must be emphasized
|
77. | Which of the following is not a factor in the failure of the systems development projects ? |
Discuss |
Answer: (a).Size of the company
|
78. | In phase 1 of the system development life cycle, which of the following aspects are usually analyzed? |
Discuss |
Answer: (d).All of these
|
79. | The feasibilities studied in preliminary investigation is (are) |
Discuss |
Answer: (d).all of these
|
80. | To which phase of SDLC, is file conversion related? |
Discuss |
Answer: (d).System implementation
|