Dive deep into the fascinating world of Software Life Cycle Models with our comprehensive set of Multiple-Choice Questions (MCQs). This page is dedicated to exploring the fundamental concepts and intricacies of Software Life Cycle Models, a crucial aspect of Software Engineering. In this section, you will encounter a diverse range of MCQs that cover various aspects of Software Life Cycle Models, from the basic principles to advanced topics. Each question is thoughtfully crafted to challenge your knowledge and deepen your understanding of this critical subcategory within Software Engineering.

frame-decoration

Check out the MCQs below to embark on an enriching journey through Software Life Cycle Models. Test your knowledge, expand your horizons, and solidify your grasp on this vital area of Software Engineering.

Note: Each MCQ comes with multiple answer choices. Select the most appropriate option and test your understanding of Software Life Cycle Models. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

Software Life Cycle Models MCQs | Page 28 of 32

Q271.
Which of the following is not a workflow in RUP?
Discuss
Answer: (c).Cleaning workflow Explanation:RUP distinguishes nine workflows, such as a requirements workflow, a test workflow, etc. Cleaning workflow is not one of the RUP workflow.
Discuss
Answer: (c).Developing deployable products Explanation:The construction phase in RUP focuses on developing deployable products, complete components are developed and thoroughly tested. User manuals are written. At the end of this phase, the first operational version of the system, the beta release, is ready.
Discuss
Answer: (b).Clearing objectives and determining the scope of the project Explanation:The inception phase in RUP focuses on getting the objectives clear, what is the scope of the project, what are its boundaries, what are the acceptance criteria that will be used when the system is delivered to its customers? During this phase too, the overall cost, schedule and risks are estimated.
Discuss
Answer: (c).Developing an architecture Explanation:The elaboration phase in RUP is mainly targeted at analyzing the problem domain, and obtaining a sound architecture. At the end of this phase, most use cases will be identified, and all major risks must be resolved.
Discuss
Answer: (d).Releasing the system to the user community and beta testing Explanation:In the transition phase, the system is released to the user community and beta tested.
Discuss
Answer: (a).The changes are being made to an existing product Explanation:A considerable maintenance effort is inevitable. Each maintenance task, whether it concerns repairing an error or adapting a system to new user requirements, in principle entails all aspects of the initial development cycle. During maintenance, we also have to analyze the problem and conceive a design which is subsequently implemented and tested. The first big difference is that these changes are being made to an existing product.
Discuss
Answer: (c).Time pressure hampers thorough analysis and design step Explanation:The second main difference, time pressure, has a much larger impact. Time pressure is most strongly felt when repairing errors, for then it is quite possible that certain parts of the organization have to shut down because the software is not operational. In such cases, we have to work against time to identify and repair the errors. Often one patches the code and skips a thorough analysis and design step. The structure of the system tends to suffer from such patches. The system’s entropy increases, which hampers later maintenance activities.
Q278.
How does patching the code during maintenance activities affect the system's structure?
Discuss
Answer: (c).It worsens the system's structure Explanation:Often one patches the code and skips a thorough analysis and design step. The structure of the system tends to suffer from such patches. The system’s entropy increases, which hampers later maintenance activities.
Discuss
Answer: (c).Software and the corresponding documentation grow apart Explanation:When the system's documentation is not updated during maintenance activities, the software and the corresponding documentation grow apart, which will hamper future maintenance activities. This makes it more difficult for maintainers to understand the system, and to make changes to it without introducing errors or causing other problems. This can lead to increased maintenance costs, and can make it more difficult to adapt the system to changing user requirements or to fix errors that are discovered later on.
Q280.
According to the laws of software evolution, what happens to a program that is changed over time?
Discuss
Answer: (b).It becomes less structured and more complex Explanation:The Law of increasing complexity states that a program that is changed becomes less and less structured and thus becomes more complex.