What are the conditions for effective control of a system in systems theory?

a.

The controlling entity must know the goals of the system

b.

The controlling entity must have sufficient control variety

c.

The controlling entity must have information on the state, input, and output of the system

d.

All of the above

Posted under Software Engineering

Answer: (d).All of the above Explanation:In systems theory, there are four conditions for effective control of a system. The first condition is that the controlling entity must know the goals of the system. The second condition is that the controlling entity must have sufficient control variety, meaning they must have the ability to manipulate the control variables in order to achieve the goals set forth. The third condition is that the controlling entity must have information on the state, input, and output of the system. The fourth and final condition is that the controlling entity must have a conceptual control model, meaning they must understand how and to what extent the different variables depend on and influence each other. All of these conditions must be met in order for effective control of a system to be achieved.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What are the conditions for effective control of a system in systems theory?

Similar Questions

Discover Related MCQs

Q. How does the degree of control in a software development project increase?

Q. What is necessary to measure both the project and the product in software development?

Q. What does controlling software development imply?

Q. How is controlling a software development project described in practice?

Q. What are the three classes of project characteristics that are important for project control?

Q. How does the degree of certainty of product characteristics affect project control?

Q. Which project characteristics are important for project control in software development?

Q. How does control differ in projects with high product certainty compared to low product certainty?

Q. What are the characteristics that are common to most or all software development projects?

Q. What are the three dimensions along which software development projects may differ?

Q. What factors determine the degree of product certainty in software development projects?

Q. What factors determine the degree of process certainty in software development projects?

Q. What is the primary determinant of resource certainty in software development projects?

Q. What are the aspects that will be discussed when discussing the control situations in software development projects?

Q. How many control situations can be derived from the three dimensions of product certainty, process certainty and resource certainty?

Q. What is the main emphasis in a situation where the requirements are known and stable, and there is sufficient control variety and resources available?

Q. What type of process model may be used in a situation where the requirements are known and stable?

Q. What is the preferred method of coordination in a situation where the requirements are known and stable?

Q. How can cost estimation be done in a situation where the requirements are known and stable?

Q. What is the main emphasis when the requirements are known and stable, and there is sufficient control variety and resources available?