adplus-dvertising
frame-decoration

Question

Which level is called as “defined” in capability maturity model?

a.

level 0

b.

level 3

c.

level 4

d.

level 1

Answer: (b).level 3

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which level is called as “defined” in capability maturity model?

Similar Questions

Discover Related MCQs

Q. COCOMO model is used for:

Q. Water fall model for software development is:

Q. In software development, value adjustment factors include the following among others:

Q. While designing the user interface, one should:

Q. In software cost estimation, base estimation is related to:

Q. In clean room software engineering:

Q. A major defect in water fall model in software development is that:

Q. Function point metric of a software also depends on the:

Q. An error message produced by an interactive system should have:

Q. System development cost estimation with use-cases is problematic because:

Q. The approach to software testing is to design test cases to:

Q. Which of the following combination is preferred with respect to cohesion and coupling?

Q. Difference between flow-chart and data-flow diagram is:

Q. Match the following:

(a) Unit test                   (i) Requirements
(b) System test             (ii) Design
(c) Validation test         (iii) Code
(d) Integration test       (iv) System Engineering

Which of the following is true?
         (a)     (b)      (c)    (d)

Q. Problems with waterfall model are:

1.    Real projects rarely follow this model proposes
2.    It is often difficult for the customer
3.    Working model is available only in the end
4.    Developers are delayed unnecessarily

Q. Which one of the following is a object-oriented approaches:

Q. Which possibility among the following is invalid in case of a Data Flow Diagram ?

Q. Which of the following tools is not required during system analysis phase of system development life cycle?

Q. Software Cost Performance index (CPI) is given by:

(Where:   BCWP stands for Budgeted Cost of Work Performed
BCWS stands for Budget Cost of Work Scheduled
ACWP stands for Actual Cost of Work Performed)

Q. Software Risk estimation involves following two tasks: