Function point metric of a software also depends on the:

a.

number of function needed

b.

number of final users of the software

c.

number of external inputs and outputs

d.

time required for one set of output from a set of input data

Answer: (c).number of external inputs and outputs

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Function point metric of a software also depends on the:

Similar Questions

Discover Related MCQs

Q. An error message produced by an interactive system should have:

Q. System development cost estimation with use-cases is problematic because:

Q. The approach to software testing is to design test cases to:

Q. Which of the following combination is preferred with respect to cohesion and coupling?

Q. Difference between flow-chart and data-flow diagram is:

Q. Match the following:

(a) Unit test                   (i) Requirements
(b) System test             (ii) Design
(c) Validation test         (iii) Code
(d) Integration test       (iv) System Engineering

Which of the following is true?
         (a)     (b)      (c)    (d)

Q. Problems with waterfall model are:

1.    Real projects rarely follow this model proposes
2.    It is often difficult for the customer
3.    Working model is available only in the end
4.    Developers are delayed unnecessarily

Q. Which one of the following is a object-oriented approaches:

Q. Which possibility among the following is invalid in case of a Data Flow Diagram ?

Q. Which of the following tools is not required during system analysis phase of system development life cycle?

Q. Software Cost Performance index (CPI) is given by:

(Where:   BCWP stands for Budgeted Cost of Work Performed
BCWS stands for Budget Cost of Work Scheduled
ACWP stands for Actual Cost of Work Performed)

Q. Software Risk estimation involves following two tasks:

Q. In a object oriented software design, ‘Inheritance’ is a kind of...................

Q. Reliability of software is directly dependent on:

Q. ‘Abstraction’ is......................step of Attribute in a software design.

Q. In software project planning, work Breakdown structure must be .................

Q. In Software Metrics, McCABE’s cyclomatic number is given by following formula:

Q. In a good software design, ................ coupling is desirable between modules.

Q. System study yields the following:

Q. The COCOMO model is used for ..................