Which possibility among the following is invalid in case of a Data Flow Diagram ?

a.

A process having in-bound data flows more than out-bound data flows

b.

A data flow between two processes

c.

A data flow between two data stores

d.

A data store having more than one in-bound data flows

Answer: (c).A data flow between two data stores

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which possibility among the following is invalid in case of a Data Flow Diagram ?

Similar Questions

Discover Related MCQs

Q. Which of the following tools is not required during system analysis phase of system development life cycle?

Q. Software Cost Performance index (CPI) is given by:

(Where:   BCWP stands for Budgeted Cost of Work Performed
BCWS stands for Budget Cost of Work Scheduled
ACWP stands for Actual Cost of Work Performed)

Q. Software Risk estimation involves following two tasks:

Q. In a object oriented software design, ‘Inheritance’ is a kind of...................

Q. Reliability of software is directly dependent on:

Q. ‘Abstraction’ is......................step of Attribute in a software design.

Q. In software project planning, work Breakdown structure must be .................

Q. In Software Metrics, McCABE’s cyclomatic number is given by following formula:

Q. In a good software design, ................ coupling is desirable between modules.

Q. System study yields the following:

Q. The COCOMO model is used for ..................

Q. The testing of software against SRS is called:

Q. The lower degree of cohesion is:

Q. The reliability of the software is directly dependent upon:

Q. Successive layer of design in software using bottom-up design is called:

Q. Sliding window concept of software project management is:

Q. A black hole in a DFD is a:

Q. The capability maturity model (err) defines 5 levels:

(a) Level 1         (i) Managed
(b) Level 2         (ii) Defined
(c) Level 3         (iii) Repeatable
(d) Level 4         (iv) Initial
(e) Level 5         (v) Optimized

correct matching is:
   a     b    c     d     e

Q. Which one of the following is not a software process model ?

Q. System Development Life-cycle has following stages:

(I) Requirement analysis        (II) Coding
(III) Design                    (IV) Testing

Which option describes the correct sequence of stages?