adplus-dvertising
frame-decoration

Question

What does the height of a rectangle in below figure stand for?

a.

The number of classes of a component

b.

The number of interfaces of a component

c.

The size of a component

d.

The stability of a component

Posted under Software Engineering

Answer: (b).The number of interfaces of a component Explanation:The height of a rectangle in figure stands for the number of interfaces of a component.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What does the height of a rectangle in below figure stand for?

Similar Questions

Discover Related MCQs

Q. What can be concluded from below figure about component A?

Q. What can be concluded from below figure about component D?

Q. What type of analysis is depicted in below figure?

Q. What does the thickness of the edges in below figure represent?

Q. What information can be inferred from the components /util/figs and /util/tools being connected by a thick edge in below figure?

Q. What are the five entities that require continuous attention of management in software development?

Q. What is the primary question addressed in the Organization of Maintenance Activities?

Q. What is the W-Type Departmentalization based on?

Q. What is the focal strength of A-Type Departmentalization?

Q. What is the focal weakness of L-Type Departmentalization?

Q. What is the main focus of the W-Type departmentalization scheme in software development?

Q. What is the main advantage of the A-Type departmentalization scheme in software development?

Q. What is the main focus of the L-Type departmentalization scheme in software development?

Q. What is the main drawback of the W-Type departmentalization scheme in software development?

Q. What is the main drawback of the A-Type departmentalization scheme in software development?

Q. What is the main drawback of the L-Type departmentalization scheme in software development?

Q. What is one of the major advantages of separating development and maintenance?

Q. Why is it difficult to predict and control progress of new system development?

Q. Why is a separation of maintenance and development beneficial for conducting a meaningful acceptance test?

Q. What is the result of concentrating on maintenance tasks?