What are some other matters that should be addressed during the requirements engineering phase for a library system?

a.

The machine and operating system on which the system will be implemented

b.

The type of DBMS that will be used

c.

The size of the database and its expected growth over time

d.

All of the above

Answer: (d).All of the above Explanation:The machine and operating system on which the system will be implemented, the type of DBMS that will be used, and the size of the database and its expected growth over time as matters that should be addressed during the requirements engineering phase for a library system.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What are some other matters that should be addressed during the requirements engineering phase for a library system?

Similar Questions

Discover Related MCQs

Q. Why is it beneficial to use a layered scheme in the formulation of user requirements?

Q. What are some of the non-technical repercussions of introducing an automated system in a library?

Q. What approach is more appropriate when the library system has to support elderly people in their dealings with the world around them?

Q. What is the difference between customer-driven software development and market-driven software development?

Q. What are some of the trade-offs that need to be made when using commercial off the shelf (COTS) components in a library system?

Q. What is the goal of requirements elicitation process?

Q. What are the guidelines for the contents of a requirements specification document?

Q. What are the basic techniques for modeling requirements?

Q. What is the main goal of requirements specification?

Q. What is the main difference between a requirements specification document and a project plan?

Q. What are some techniques used for specifying requirements?

Q. What are the four processes in requirements engineering according to Sommerville (2005)?

Q. What is the purpose of a requirements specification document?

Q. What is the goal of the requirements validation and verification process?

Q. What is the main purpose of the requirements negotiation process?

Q. In what stage of the requirements engineering process is design and implementation typically included?

Q. What is the main focus of the requirements engineering process?

Q. What is the role of the requirements analyst in the requirements elicitation process?

Q. What are some common techniques used for specifying requirements?

Q. What is the role of the central repository in requirements engineering?