What is the main difference between a requirements specification document and a project plan?

a.

The requirements specification document describes the product to be delivered, while the project plan describes the process of how it is developed.

b.

The requirements specification document describes the process of how the product is developed, while the project plan describes the product to be delivered.

c.

Both documents describe the same thing

d.

There is no difference between the two

Answer: (a).The requirements specification document describes the product to be delivered, while the project plan describes the process of how it is developed. Explanation:The requirements specification document describes the product to be delivered, not the process of how it is developed. Project requirements are described in the project plan.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What is the main difference between a requirements specification document and a project plan?

Similar Questions

Discover Related MCQs

Q. What are some techniques used for specifying requirements?

Q. What are the four processes in requirements engineering according to Sommerville (2005)?

Q. What is the purpose of a requirements specification document?

Q. What is the goal of the requirements validation and verification process?

Q. What is the main purpose of the requirements negotiation process?

Q. In what stage of the requirements engineering process is design and implementation typically included?

Q. What is the main focus of the requirements engineering process?

Q. What is the role of the requirements analyst in the requirements elicitation process?

Q. What are some common techniques used for specifying requirements?

Q. What is the role of the central repository in requirements engineering?

Q. The primary goal of the requirements engineering phase is to:

Q. The part of reality that we are interested in during requirements engineering is referred to as:

Q. The model constructed during the requirements engineering phase is:

Q. The adjective 'explicit' in the phrase 'explicit conceptual model' means that the model should:

Q. One of the persistent problems of requirements analysis is:

Q. What are the two sets of system users in a library system that are not disjoint?

Q. What is the implicit conceptual model?

Q. What are the two types of problems that arise during conceptual modeling?

Q. What is the problem to be addressed by the automated system?

Q. What is the main challenge that the analyst faces when working on large projects?