Question

Which chart is a tool that depicts project as network diagram that is capable of graphically representing main events of project in both parallel and consecutive way?

a.

PERT chart

b.

Gantt chart

c.

Both a and b above

d.

None of the above

Answer: (a).PERT chart

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which chart is a tool that depicts project as network diagram that is capable of graphically representing main events of project in both parallel and consecutive way?

Similar Questions

Discover Related MCQs

Q. Which of the following is not one of the principles of good coding?

Q. Which of the following are tasks in the generic task set for construction?

Q. The system engineering process usually begins with the

Q. To construct a system model the engineer should consider which of the following restraining factors?

Q. During business process engineering, three different architectures are examined.

Q. Which elements of business processing engineering are the responsibilities of the software engineer?

Q. The architecture components for product engineering are

Q. The top level of the hierarchical model of a system is known as the

Q. The system model template contains which of the following elements

Q. UML notations that can be used to model the hardware and software elements of a system are

Q. Which of following is not a UML diagram used creating a system analysis model?

Q. Which of the following is not an objective for building an analysis model?

Q. The relationships shown in a data model must be classified to show their

Q. The entity relationship diagram

Q. A generalized description of a collection of similar objects is a

Q. UML activity diagrams are useful in representing which analysis model elements?

Q. The data flow diagram

Q. Control flow diagrams are

Q. Which of the following should be considered as candidate objects in a problem space?

Q. Which of the following is not one of the broad categories used to classify operations?