adplus-dvertising
frame-decoration

Question

The preliminary evaluation of a top-down design before programs are written is referred to a (an)

a.

scheduled review

b.

formal design review

c.

informal design review

d.

structured walkthrough

Posted under Software Engineering

Answer: (c).informal design review

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. The preliminary evaluation of a top-down design before programs are written is referred to a (an)

Similar Questions

Discover Related MCQs

Q. On a system flowchart, the online manual keeping of input data is identified by using the

Q. Which of the following is not a part of a Data Flow Diagram?

Q. A data flow diagram is

Q. Which of the following is not an advantage of the structured approach to system development?

Q. The approach used in top-down analysis and design is

Q. Structured programming involves

Q. To avoid errors in transcription and transposition, during data entry, the System Analyst should

Q. Data Flow-Diagram (DFD) shows

Q. Which of the following symbol is (are) not used in the Data Flow Diagram (DFD)?

Q. A square symbol

Q. An Open rectangle

Q. While constructing a data dictionary, the analyst considers

Q. Which of the following is not considered a tool at the system design phase?

Q. Which of the following appropriately explains the desirable characteristics of good system design?

Q. Which of the following is not a characteristic of structured system development?

Q. Name of the programming technique which emphasizes breaking large and complex task into successively smaller sections is

Q. A central block associated with structured programming is

Q. A desired result of structured programming is

Q. At the time of system study, flow of charts are drawn using

Q. Managing systems analysis and design, computer programme and systems maintenance activities are called