adplus-dvertising
frame-decoration

Question

The approach used in top-down analysis and design is

a.

to prepare flowcharts after programming has been completed

b.

to identifY the top level functions by combining many smaller components into a single entity

c.

to identify a top level function and then create a hierarchy of lower level modules and components

d.

all of these

Answer: (c).to identify a top level function and then create a hierarchy of lower level modules and components

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. The approach used in top-down analysis and design is

Similar Questions

Discover Related MCQs

Q. Structured programming involves

Q. To avoid errors in transcription and transposition, during data entry, the System Analyst should

Q. Data Flow-Diagram (DFD) shows

Q. Which of the following symbol is (are) not used in the Data Flow Diagram (DFD)?

Q. A square symbol

Q. An Open rectangle

Q. While constructing a data dictionary, the analyst considers

Q. Which of the following is not considered a tool at the system design phase?

Q. Which of the following appropriately explains the desirable characteristics of good system design?

Q. Which of the following is not a characteristic of structured system development?

Q. Name of the programming technique which emphasizes breaking large and complex task into successively smaller sections is

Q. A central block associated with structured programming is

Q. A desired result of structured programming is

Q. At the time of system study, flow of charts are drawn using

Q. Managing systems analysis and design, computer programme and systems maintenance activities are called

Q. PSP process model defines framework activities that are

Q. PSP stands for

Q. In PSP, by using measures and metrics collected, effectiveness and modification of process is determined by

Q. In PSP, component level design is refined and reviewed by

Q. Development task are identified and a project schedule is created in