adplus-dvertising
frame-decoration

Question

Why is Requirements Elicitation a difficult task ?

a.

Problem of scope

b.

Problem of understanding

c.

Problem of volatility

d.

All of the mentioned

Posted under Software Engineering

Answer: (d).All of the mentioned

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Why is Requirements Elicitation a difficult task ?

Similar Questions

Discover Related MCQs

Q. What requirement gathering method developed at IBM in 1970s is used for managing requirement elicitation ?

Q. How many Scenarios are there in elicitation activities ?

Q. Which of the following elicitation techniques is a view-point based method ?

Q. ___________ and ____________ are the two view points discussed in Controlled Requirements Expression (CORE).

Q. What is the major drawback of CORE(Controlled Requirements Expression) ?

Q. Choose a framework that corresponds to Issue Based Information System (IBIS).

Q. How is CORE different from IBIS ?

Q. Which of the following Requirement Elicitation Techniques removes the poor understanding of application domain and lack of common terminology between the users and the analysts ?

Q. How many steps are involved in Feature Oriented Domain Analysis (FODA) ?

Q. Which one of the following is not an actor in JAD sessions ?

Q. What of the following is not an output of a JAD session ?

Q. How is throwaway prototype different from evolutionary prototype ?

Q. Keeping the requirements of QFD in mind which of the following is not an example of an Expected Requirement ?

Q. Which of the following Requirement Elicitation Techniques is applicable to messy, changing and ill-defined problem situations ?

Q. Choose the disadvantage of using SSM as an elicitation technique.

Q. Who controls the FAST (Facilitated Application Specification Techniques) meeting ?

Q. Arrange the steps in order to represent the conducting of Wideband Delphi Technique.
i. Conduct a group discussion
ii. Conduct another group discussion
iii. Present experts with a problem
iv. Collect expert opinion anonymously
v. Iterate until consensus is reached
vi. Feedback a summary of result to each expert

Q. Which of the following is not a diagram studied in Requirement Analysis ?

Q. How many feasibility studies is conducted in Requirement Analysis ?

Q. How many phases are there in Requirement Analysis ?