adplus-dvertising
frame-decoration

Question

The Capability Maturity Model (CMM) is a continuous model.

a.

True

b.

False

c.

Can't say

d.

None of the mentioned

Posted under Software Engineering

Answer: (b).False

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. The Capability Maturity Model (CMM) is a continuous model.

Similar Questions

Discover Related MCQs

Q. The CMMI assessment is based on a x-point scale. What is the value of x?

Q. Which of the following is not included in failure costs?

Q. Which requirements are the foundation from which quality is measured?

Q. Which of the following is not a SQA plan for a project?

Q. Degree to which design specifications are followed in manufacturing the product is called

Q. Which of the following is not included in External failure costs?

Q. Which of the following is not an appraisal cost in SQA?

Q. Who identifies, documents, and verifies that corrections have been made to the software?

Q. The primary objective of formal technical reviews is to find _________ during the process so that they do not become defects after release of the software.

Q. What is not included in prevention costs?

Q. Software quality assurance consists of the auditing and reporting functions of management.

Q. CMM stands for

Q. The ISO 9000 series of standards is a program that can be used for external quality assurance purposes.

Q. According to ISO 9001, the causes of nonconforming product should be

Q. .CO policy in CMM means

Q. ISO 9001 is not concerned with ____________ of quality records.

Q. Which of the following is not a maturity level in CMM?

Q. In CMM, the life cycle activities of requirements analysis, design, code, and test are described in

Q. Which of the following requires design control measures, such as holding and recording design reviews and qualification tests?

Q. The CMM emphasizes