Question

Which of the following is not a SQA plan for a project?

a.

evaluations to be performed

b.

amount of technical work

c.

audits and reviews to be performed

d.

documents to be produced by the SQA group

Posted under Software Engineering

Answer: (b).amount of technical work

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which of the following is not a SQA plan for a project?

Similar Questions

Discover Related MCQs

Q. Degree to which design specifications are followed in manufacturing the product is called

Q. Which of the following is not included in External failure costs?

Q. Which of the following is not an appraisal cost in SQA?

Q. Who identifies, documents, and verifies that corrections have been made to the software?

Q. The primary objective of formal technical reviews is to find _________ during the process so that they do not become defects after release of the software.

Q. What is not included in prevention costs?

Q. Software quality assurance consists of the auditing and reporting functions of management.

Q. CMM stands for

Q. The ISO 9000 series of standards is a program that can be used for external quality assurance purposes.

Q. According to ISO 9001, the causes of nonconforming product should be

Q. .CO policy in CMM means

Q. ISO 9001 is not concerned with ____________ of quality records.

Q. Which of the following is not a maturity level in CMM?

Q. In CMM, the life cycle activities of requirements analysis, design, code, and test are described in

Q. Which of the following requires design control measures, such as holding and recording design reviews and qualification tests?

Q. The CMM emphasizes

Q. _______ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics.

Q. Quality Management in software engineering is also known as

Q. Quality also can be looked at in terms of user satisfaction which includes

Q. Inspections and testing are what kinds of Quality Costs?