Assuming the existence of a start and end nodes for a program graph (PG), the total number of Paths is equivalent to ..................................set of test data required to test software.

a.

Minimum

b.

Maximum

c.

Optimum

d.

Supreme

Answer: (a).Minimum

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Assuming the existence of a start and end nodes for a program graph (PG), the total number of Paths is equivalent to ..................................set of test data required to...

Similar Questions

Discover Related MCQs

Q. Structure programming codes include

Q. A desirable property of module is

Q. Which of the following types of maintenance takes the maximum chunk of the total Maintenance effort in a typical commercial application environment?

Q. An important aspect in coding is

Q. One way to improve readability in coding is to

Q. The data flow Model of an application mainly shows

Q. The extent to which the software can control to operate correctly despite the introduction of Invalid input is called as

Q. If the number of conditions in a decision table is n, the n (c) maximum number of rules (Column) possible is

Q. Which of the following is not true?

Q. Configuration management is not concerned with

Q. Data flow diagram, regular expression and transition table can be combined to provide..........for functional specifications of system software.

Q. A program P calls two subprograms P1 and P2. P1 can be fail 50% and P2 can fail 40% times. Then P can fail

Q. Probability of success of two modules in unit testing of 0.9 each. The probability of success of Integration testing is 0.9. The Joint probability of success is

Q. The graph theoretic concept will be useful in software testing is

Q. In a decision table if there are 3 variables and 3 rules, it implies

Q. Which of the following software engineering concept does Ada language support?

Q. The testing method which is normally used as alleptance for a software system is

Q. A computer program can often be a very satisfactory.................of a physical system such as road traffic conditions.

Q. On an average, the programmes months is given by 3.6 x (KDSI)¹·². If so a project requiring one Thousand source instructions will require

Q. Considering a program graph (PG) with statement as vertices and control as edges. Then