Question

Which process model is also called as classic life cycle model?

a.

Waterfall model

b.

RAD model

c.

Prototyping  model

d.

Incremental model

Answer: (a).Waterfall model

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which process model is also called as classic life cycle model?

Similar Questions

Discover Related MCQs

Q. Cohesion is an extension of :

Q. Which one from the following is highly associated activity of project planning?

Q. Module design is used to maximize cohesion and minimize coupling. Which of the following is the key to implement this rule?

Q. Verification :

Q. Which design metric is used to measure the compactness of the program in terms of lines of code?

Q. Requirements prioritization and negotiation belongs to :

Q. Adaptive maintenance is a maintenance which ___________.

Q. A Design concept Refinement is a :

Q. A software design is highly modular if :

Q. Match the following for methods of MIS development:

List – I List – II

(a) Joint Application Design (JAD) (i) Delivers functionality in rapid iteration measured in weeks and needs frequent communication, development, testing and delivery

(b) Computer Aided Software Engg (ii) Reusable applications generally with one specific function. It is closely linked with idea of web services and service oriented architecture.

(c) Agile development (iii) Tools to automate many tasks of SDLC

(d) Component based technology (iv) A group based tool for collecting user requirements and creating system design. Mostly used in analysis and design stages of SDLC

code:
a b c d

Q. Software testing is

Q. Assume that a program will experience 200 failures in infinite time. It has now experienced 100 failures. The initial failure intensity was 20 failures/CPU hr. Then the current failure intensity will be

Q. Consider a project with the following functional units:
Number of user inputs = 50
Number of user outputs = 40
Number of user inquiries = 35
Number of user files = 06
Number of external interfaces = 04
Assuming all complexity adjustment factors  and  weighing  factors  as average, the function points for the project will be

Q. Match the following:

List-I                           List-II

a. Correctness                i.  The extent to which a software tolerates the unexpected problems

b. Accuracy                       ii.  The extent to which a software meets its specifications

c. Robustness                iii. The extent to which a software has specified functions

d. feof()                             iv. Meeting specifications with precision

Codes:

a       b       c       d

Q. Which one of the following is not a definition of error ?

Q. Which one of the following is not a key process area in CMM level 5 ?

Q. If S1 is total number of modules defined in the program architecture, S3 is the number of modules whose correct function depends on prior processing then the number of modules not dependent on prior processing is:

Q. The ................ model is preferred for software development when the requirements are not clear.

Q. Which of the following is not included in waterfall model ?

Q. The extent to which a software tolerates the unexpected problems, is termed as: