Question
a.
Keep track of the project
b.
Compare actual and planned progress and costs
c.
Identify the activities, milestones and deliverables produced by a project
d.
Both b and c
Engage with the Community - Add Your Comment
Confused About the Answer? Ask for Details Here.
Know the Explanation? Add it Here.
Q. Which one from the following is highly associated activity of project planning?
Similar Questions
Discover Related MCQs
Q. Module design is used to maximize cohesion and minimize coupling. Which of the following is the key to implement this rule?
View solution
Q. Verification :
View solution
Q. Which design metric is used to measure the compactness of the program in terms of lines of code?
View solution
Q. Requirements prioritization and negotiation belongs to :
View solution
Q. Adaptive maintenance is a maintenance which ___________.
View solution
Q. A Design concept Refinement is a :
View solution
Q. A software design is highly modular if :
View solution
Q. Match the following for methods of MIS development:
List – I List – II
(a) Joint Application Design (JAD) (i) Delivers functionality in rapid iteration measured in weeks and needs frequent communication, development, testing and delivery
(b) Computer Aided Software Engg (ii) Reusable applications generally with one specific function. It is closely linked with idea of web services and service oriented architecture.
(c) Agile development (iii) Tools to automate many tasks of SDLC
(d) Component based technology (iv) A group based tool for collecting user requirements and creating system design. Mostly used in analysis and design stages of SDLC
code:
a b c d
View solution
Q. Software testing is
View solution
Q. Assume that a program will experience 200 failures in infinite time. It has now experienced 100 failures. The initial failure intensity was 20 failures/CPU hr. Then the current failure intensity will be
View solution
Q. Consider a project with the following functional units:
Number of user inputs = 50
Number of user outputs = 40
Number of user inquiries = 35
Number of user files = 06
Number of external interfaces = 04
Assuming all complexity adjustment factors and weighing factors as average, the function points for the project will be
View solution
Q. Match the following:
List-I List-II
a. Correctness i. The extent to which a software tolerates the unexpected problems
b. Accuracy ii. The extent to which a software meets its specifications
c. Robustness iii. The extent to which a software has specified functions
d. feof() iv. Meeting specifications with precision
Codes:
a b c d
View solution
Q. Which one of the following is not a definition of error ?
View solution
Q. Which one of the following is not a key process area in CMM level 5 ?
View solution
Q. If S1 is total number of modules defined in the program architecture, S3 is the number of modules whose correct function depends on prior processing then the number of modules not dependent on prior processing is:
View solution
Q. The ................ model is preferred for software development when the requirements are not clear.
View solution
Q. Which of the following is not included in waterfall model ?
View solution
Q. The extent to which a software tolerates the unexpected problems, is termed as:
View solution
Q. Software Engineering is an engineering discipline that is concerned with:
View solution
Q. Which of the following is not one of three software product aspects addressed by McCall's software quality factors?
View solution
Suggested Topics
Are you eager to expand your knowledge beyond Software Engineering? We've curated a selection of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of Computer Science. Happy exploring!