adplus-dvertising
frame-decoration

Question

What is one of the major problems with testing software systems?

a.

Deciding when to start

b.

Deciding when to stop

c.

Collecting reliability information

d.

Predicting reliability level

Posted under Software Engineering

Answer: (b).Deciding when to stop Explanation:One of the major problems with testing software systems is deciding when to stop.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. What is one of the major problems with testing software systems?

Similar Questions

Discover Related MCQs

Q. What is the starting point for the statistical models of software reliability?

Q. What is the difference between faults and failures in software systems?

Q. What is the goal of most test techniques?

Q. What does reliability mean in the context of the software testing?

Q. What is the definition of reliability in the context of software systems?

Q. What is the difference between execution time and calendar time in the context of software reliability?

Q. What are some factors that can affect the failure behavior of a program?

Q. What is the reason for the uncertainty in the expected time of software failure?

Q. What is the purpose of modeling subsequent failures as a stochastic process?

Q. What is the meaning of non-homogeneous Poisson process?

Q. What is the relationship between failure intensity function and the number of failures observed?

Q. What is the basic execution time model (BM)?

Q. What is the difference between the basic execution time model (BM) and the logarithmic Poisson execution time model (LPM)?

Q. How many parameters does the BM model have?

Q. What is the definition of operational profile?

Q. What is the shape of the failure intensity curve in case of a strong non-uniform operational profile?

Q. What is the relationship between the failure intensity and mean failures in both BM and LPM models?

Q. Does the effectiveness of fault correction remain constant over time in the BM model?

Q. Does the expected number of failures in infinite time in the LPM model become infinite?

Q. How does the effectiveness of fault correction change with time in the LPM model?