adplus-dvertising
frame-decoration

Question

How is the design phase of software development usually split?

a.

Into a global design phase and a detailed design phase

b.

Into a requirements engineering phase and a testing phase

c.

Into a construction phase and a maintenance phase

d.

It is not split, it remains as a single phase

Answer: (a).Into a global design phase and a detailed design phase Explanation:The design phase of software development is often split into a global, architectural design phase and a detailed design phase. This allows for a more detailed and specific design to be developed based on the requirements and overall architecture of the system.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. How is the design phase of software development usually split?

Similar Questions

Discover Related MCQs

Q. How do the phases of software development progress?

Q. What is the goal of the requirements engineering phase?

Q. What is the purpose of the feasibility study?

Q. What is the document in which the result of the requirements engineering activity is laid down called?

Q. What is the purpose of the feasibility study during the requirements engineering phase?

Q. What is the goal of the design phase?

Q. How does the quality of the final system is affected by early design decisions?

Q. What is the main goal of requirements engineering phase?

Q. What is the result of the design phase?

Q. What is the starting point of implementation phase?

Q. What is often introduced in the implementation phase to bridge the gap between component specification and executable code?

Q. What is the primary goal of a programmer during the implementation phase?

Q. How is the global structure imposed during the design phase retained in the final code?

Q. What is the main goal of the programmer during the implementation phase?

Q. What is the starting point of the implementation phase?

Q. What is the result of the implementation phase?

Q. What is a pseudocode?

Q. In what programming languages does the structure of the system tends to get lost during the transition from design to code?

Q. What is the goal of testing at phase boundaries?

Q. What is the main advantage of detecting errors early during the software development process?