adplus-dvertising
frame-decoration

Question

Which of the following statements about ERP system is true?

a.

Most ERP software implementations fully achieve seamless integration.

b.

ERP software packages are themselves combinations of seperate applications for manufacturing, materials, resource planning, general ledger, human resources, procurement and order entry.

c.

Integration of ERP systems can be achieved in only one way.

d.

An ERP package implemented uniformly throughout an enterprise is likely to contain very flexible connections to allow charges and software variations.

Answer: (b).ERP software packages are themselves combinations of seperate applications for manufacturing, materials, resource planning, general ledger, human resources, procurement and order entry.

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which of the following statements about ERP system is true?

Similar Questions

Discover Related MCQs

Q. Statistical software quality assurance in software engineering involves ................

Q. Which of the following statements is/are FALSE with respect to software testing?

S1 : White-box tests are based on specifications; better at telling whether program meets specification, better at finding errors of ommission.
S2 : Black-box tests are based on code; better for finding crashes, out of bounds errors, file not closed errors.
S3 : Alpha testing is conducted at the developer’s site by a team of highly skilled testers for software that is developed as a product to be used by many customers.

Q. A signal processor software is expected to operate for 91.25 days after repair, and the mean software repair time is expected to be 5 minutes. Then, the availability of the software is :

Q. A simple stand - alone software utility is to be developed in ’C’ programming by a team of software experts for a computer running Linux and the overall size of this software is estimated to be 20,000 lines of code. Considering (a, b) = (2.4, 1.05) as multiplicative and exponention factor for the basic COCOMO effort estimation equation and (c, d)=(2.5, 0.38) as multiplicative and exponention factor for the basic COCOMO development time estimation equation, approximately how long does the software project take to complete?

Q. In Software Configuration Management (SCM), which of the following is a use-case supported by standard version control systems?

(a) Managing several versions or releases of a software
(b) Filing bug reports and tracking their progress
(c) Allowing team members to work in parallel
(d) Identifying when and where a regression occurred

Q. Software engineering primary aims on

Q. A good specification should be

Q. Which of the following is a tool in design phase?

Q. Information hiding is hide from user, details that

Q. In object oriented design of software

Q. Design phase includes

Q. Assertions are conditions which are true at the points of execution

Q. Assuming the existence of a start and end nodes for a program graph (PG), the total number of Paths is equivalent to ..................................set of test data required to test software.

Q. Structure programming codes include

Q. A desirable property of module is

Q. Which of the following types of maintenance takes the maximum chunk of the total Maintenance effort in a typical commercial application environment?

Q. An important aspect in coding is

Q. One way to improve readability in coding is to

Q. The data flow Model of an application mainly shows

Q. The extent to which the software can control to operate correctly despite the introduction of Invalid input is called as