Question
a.
Round Robin
b.
First-In First-Out
c.
Multilevel Queue Scheduling
d.
Multilevel Queue Scheduling with Feedbac
Posted under GATE cse question paper Operating System
Engage with the Community - Add Your Comment
Confused About the Answer? Ask for Details Here.
Know the Explanation? Add it Here.
Q. Which of the following scheduling algorithms is non-preemptive?
Similar Questions
Discover Related MCQs
Q. Consider a set of n tasks with known runtimes r1, r2, .... rn to be run on a uniprocessor machine. Which of the following processor scheduling algorithms will result in the maximum throughput?
View solution
Q. Consider a uniprocessor system executing three tasks T1, T2 and T3, each of which is composed of an infinite sequence of jobs (or instances) which arrive periodically at intervals of 3, 7 and 20 milliseconds, respectively. The priority of each task is the inverse of its period and the available tasks are scheduled in order of priority, with the highest priority task scheduled first. Each instance of T1, T2 and T3 requires an execution time of 1, 2 and 4 milliseconds, respectively. Given that all tasks initially arrive at the beginning of the 1st milliseconds and task preemptions are allowed, the first instance of T3 completes its execution at the end of ______________ milliseconds.
View solution
Q. The maximum number of processes that can be in Ready state for a computer system with n CPUs is
View solution
Q. For the processes listed in the following table, which of the following scheduling schemes will give the lowest average turnaround time?
Process : Arrival Time Processing Time
A : 0 3
B : 1 6
C : 4 4
D : 6 2
View solution
Q. Which of the following is FALSE about SJF (Shortest Job First Scheduling)?
S1: It causes minimum average waiting time
S2: It can cause starvation
View solution
Q. Two concurrent processes P1 and P2 use four shared resources R1, R2, R3 and R4, as shown below.
P1 P2
Compute: Use R1; Use R2; Use R3; Use R4; Compute; Use R1; Use R2; Use R3;. Use R4;
Both processes are started at the same time, and each resource can be accessed by only one process at a time The following scheduling constraints exist between the access of resources by the processes:
P2 must complete use of R1 before P1 gets access to R1
P1 must complete use of R2 before P2 gets access to R2.
P2 must complete use of R3 before P1 gets access to R3.
P1 must complete use of R4 before P2 gets access to R4.
There are no other scheduling constraints between the processes. If only binary semaphores are used to enforce the above scheduling constraints, what is the minimum number of binary semaphores needed?
View solution
Q. We wish to schedule three processes P1, P2 and P3 on a uniprocessor system. The priorities, CPU time requirements and arrival times of the processes are as shown below.
Process Priority CPU time required Arrival time (hh:mm:ss)
P1 10(highest) 20 sec 00:00:05
P2 9 10 sec 00:00:03
P3 8 (lowest) 15 sec 00:00:00
We have a choice of preemptive or non-preemptive scheduling. In preemptive scheduling, a late-arriving higher priority process can preempt a currently running process with lower priority. In non-preemptive scheduling, a late-arriving higher priority process must wait for the currently executing process to complete before it can be scheduled on the processor. What are the turnaround times (time from arrival till completion) of P2 using preemptive and non-preemptive scheduling respectively.
View solution
Q. Consider an arbitrary set of CPU-bound processes with unequal CPU burst lengths submitted at the same time to a computer system. Which one of the following process scheduling algorithms would minimize the average waiting time in the ready queue?
View solution
Q. Assume every process requires 3 seconds of service time in a system with single processor. If new processes are arriving at the rate of 10 processes per minute, then estimate the fraction of time CPU is busy in system?
View solution
Q. Consider the following code fragment:
if (fork() == 0)
{ a = a + 5; printf("%d,%d\n", a, &a); }
else { a = a –5; printf("%d, %d\n", a, &a); }
Let u, v be the values printed by the parent process, and x, y be the values printed by the child process. Which one of the following is TRUE?
View solution
Q. The atomic fetch-and-set x, y instruction unconditionally sets the memory location x to 1 and fetches the old value of x in y without allowing any intervening access to the memory location x. consider the following implementation of P and V functions on a binary semaphore .
void P (binary_semaphore *s) {
unsigned y;
unsigned *x = &(s->value);
do {
fetch-and-set x, y;
} while (y);
}
void V (binary_semaphore *s) {
S->value = 0;
}
Which one of the following is true?
View solution
Q. Three concurrent processes X, Y, and Z execute three different code segments that access and update certain shared variables. Process X executes the P operation (i.e., wait) on semaphores a, b and c; process Y executes the P operation on semaphores b, c and d; process Z executes the P operation on semaphores c, d, and a before entering the respective code segments. After completing the execution of its code segment, each process invokes the V operation (i.e., signal) on its three semaphores. All semaphores are binary semaphores initialized to one. Which one of the following represents a deadlockfree order of invoking the P operations by the processes?
View solution
Q. A shared variable x, initialized to zero, is operated on by four concurrent processes W, X, Y, Z as follows. Each of the processes W and X reads x from memory, increments by one, stores it to memory, and then terminates. Each of the processes Y and Z reads x from memory, decrements by two, stores it to memory, and then terminates. Each process before reading x invokes the P operation (i.e., wait) on a counting semaphore S and invokes the V operation (i.e., signal) on the semaphore S after storing x to memory. Semaphore S is initialized to two. What is the maximum possible value of x after all processes complete execution?
View solution
Q. A process executes the code
fork();
fork();
fork();
The total number of child processes created is
View solution
Q. Fetch_And_Add(X,i) is an atomic Read-Modify-Write instruction that reads the value of memory location X, increments it by the value i, and returns the old value of X. It is used in the pseudocode shown below to implement a busy-wait lock. L is an unsigned integer shared variable initialized to 0. The value of 0 corresponds to lock being available, while any non-zero value corresponds to the lock being not available.
AcquireLock(L){
while (Fetch_And_Add(L,1))
L = 1;
}
ReleaseLock(L){
L = 0;
}
This implementation
View solution
Q. The time taken to switch between user and kernel modes of execution be t1 while the time taken to switch between two processes be t2. Which of the following is TRUE?
View solution
Q. A thread is usually defined as a "light weight process" because an operating system (OS) maintains smaller data structures for a thread than for a process. In relation to this, which of the following is TRUE?
View solution
Q. Consider the methods used by processes P1 and P2 for accessing their critical sections whenever needed, as given below. The initial values of shared boolean variables S1 and S2 are randomly assigned.
Method Used by P1
while (S1 == S2) ;
Critica1 Section
S1 = S2;
Method Used by P2
while (S1 != S2) ;
Critica1 Section
S2 = not (S1);
Which one of the following statements describes the properties achieved?
View solution
Q. The enter_CS() and leave_CS() functions to implement critical section of a process are realized using test-and-set instruction as follows:
void enter_CS(X)
{
while test-and-set(X) ;
}
void leave_CS(X)
{
X = 0;
}
In the above solution, X is a memory location associated with the CS and is initialized to 0. Now consider the following statements: I. The above solution to CS problem is deadlock-free II. The solution is starvation free. III. The processes enter CS in FIFO order. IV More than one process can enter CS at the same time. Which of the above statements is TRUE?
View solution
Q. The P and V operations on counting semaphores, where s is a counting semaphore, are defined as follows:
P(s) : s = s - 1;
if (s < 0) then wait;
V(s) : s = s + 1;
if (s <= 0) then wakeup a process waiting on s;
Assume that Pb and Vb the wait and signal operations on binary semaphores are provided. Two binary semaphores Xb and Yb are used to implement the semaphore operations P(s) and V(s) as follows:
P(s) : Pb(Xb);
s = s - 1;
if (s < 0) {
Vb(Xb) ;
Pb(Yb) ;
}
else Vb(Xb);
V(s) : Pb(Xb) ;
s = s + 1;
if (s <= 0) Vb(Yb) ;
Vb(Xb) ;
The initial values of Xb and Yb are respectively.
View solution
Suggested Topics
Are you eager to expand your knowledge beyond Operating System? We've curated a selection of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of Computer Science. Happy exploring!