adplus-dvertising
frame-decoration

Question

How many assumptions have to meet for a rate monotonic scheduling?

a.

3

b.

4

c.

5

d.

6

Answer: (d).6

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. How many assumptions have to meet for a rate monotonic scheduling?

Similar Questions

Discover Related MCQs

Q. Which of the following can be applied to periodic scheduling?

Q. Which of the following periodic scheduling is dynamic?

Q. Which of the following do the sporadic events are connected?

Q. Which of the following can execute quickly, if the interrupt priority is higher in the system?

Q. Which of the following are used to execute at regular intervals and check for ready sporadic tasks?

Q. How is sporadic task can turn into a periodic task?

Q. Which of the following is more difficult than the scheduling independent task?

Q. Which scheduling is the basis for a number of formal proofs of schedulability?

Q. Which of the following is an independent scheduling?

Q. Which allows the parallel development of the hardware and software in the simulation?

Q. Which of the following are used to test the software?

Q. Which allows the UNIX software to be ported using a simple recompilation?

Q. Which of the following can simulate the processor, memory, and peripherals?

Q. How many categories are there for the low-level simulation?

Q. Which of the following can simulate the LCD controllers and parallel ports?

Q. Which of the following provides a low-level method of debugging software?

Q. Which of the following has the ability to download code using a serial port?

Q. What does the processor fetches from the EPROM if the board is powered?

Q. Which of the following device can transfer the vector table from the EPROM?

Q. Which of the following is used to determine the number of memory access in an onboard debugger?