adplus-dvertising
frame-decoration

Question

Which estimate approach take more time to consume?

a.

accurate value

b.

estimated value

c.

accurate cost and performance value

d.

estimated cost and performance value

Posted under Embedded Systems

Answer: (c).accurate cost and performance value

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which estimate approach take more time to consume?

Similar Questions

Discover Related MCQs

Q. Which estimation technique can be used if interfaces to software synthesis tools and hardware synthesis tools exist?

Q. Which of the following is the base for scheduling algorithm?

Q. Which classification is based on the extension to standard operating systems?

Q. Which of the following defines the task which must be executed at every defined unit of time?

Q. Which of the task are not periodic?

Q. Which of the following is an aperiodic task requesting the processor at unpredictable times?

Q. Which of the scheduling algorithm are based on the assumption that tasks are executed until they are done?

Q. Which of the following schedulers take decisions at run-time?

Q. Which scheduler take their designs at design time?

Q. Which scheduler generates tables and forward to the dispatcher?

Q. Which of the following systems are entirely controlled by the timer?

Q. What does TDL stand for?

Q. Which scheduling algorithm can be used in mixed software/hardware systems?

Q. Which algorithm can distinguish homogeneous multiprocessor system and heterogeneous multiprocessor system?

Q. Which of the following scheduling test can be used to show that no scheduling exist?

Q. Which scheduling test is used to indicate that no scheduling exist even if there exist one?

Q. Which algorithm can be used to schedule tasks at run-time?

Q. Which algorithm is based on Jackson’s rule?

Q. What does EDD stand for?

Q. Which of the following can be implemented as static scheduling algorithm?