Which steps are included in use case driven iterative development ?

a.

At each iteration, one or more use cases are selected for implementation

b.

Iteration should be followed until system is complete

c.

Iterative development builds system functionality gradually through analysis, design, coding, testing and evaluation

d.

All of the mentioned

Answer: (d).All of the mentioned

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which steps are included in use case driven iterative development ?

Similar Questions

Discover Related MCQs

Q. Which of these states the goal of engineering design analysis ?

Q. What methods can be followed if designers are out of good SRS or engineering design ?

Q. Why is Modelling one of the best way to carry out analysis ?

Q. Engineering design activities consists of which of the following ?

Q. A generic software engineering design follows which of the activities ?

Q. Architectural design stage include which of the following activity ?

Q. Detailed design stage include which of the following activity ?

Q. What is Analysis model ?

Q. Which of these are types of class model used in object oriented analysis ?

Q. Which of the following represents the use of Conceptual models during product design?

Q. Which of the following represents the use of Conceptual models during engineering design?

Q. What are Design Class Models ?

Q. Conceptual models are useful for which of the following reasons ?

Q. What does a simple name in UML Class and objects consists of ?

Q. What Does a Composite name consists of in a UML Class and object diagram ?

Q. A Class consists of which of these abstractions?

Q. A class is divided into which of these compartments ?

Q. An attribute is a data item held by which of the following ?

Q. What should be mentioned as attributes for conceptual modelling ?

Q. An operation can be described as?