adplus-dvertising
frame-decoration

Question

Spreading data over multiple disks, called

a.

Striping

b.

Disk arrays

c.

Window

d.

Areal density

Posted under Operating System

Answer: (a).Striping

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Spreading data over multiple disks, called

Similar Questions

Discover Related MCQs

Q. I/O throughput is sometimes called I/O bandwidth and response time is sometimes called

Q. When a fault occurs, it creates a latent error, when gets activated, becomes

Q. An I/O system with a single disk gets on average 50 I/O requests per second and the average time for a disk to service an I/O request is 10 ms, the utilization of the I/O system would be

Q. Bits or blocks in a file going bad over time, is a

Q. Faults that do not correct themselves with the passing of time, are

Q. Improvement in capacity is customarily expressed as improvement in

Q. The time for the user to enter the command, is refered as

Q. For disks with more than 200 cylinders, the seek distance is:

Q. One of the most widely used exponential distributions is called a

Q. The squared coefficient of variance, traditionally called

Q. Throughput is the performance metric, but response times are

Q. Redundant disk arrays have become known, by the acronym

Q. In a RAID disk array, the logical unit is configured as a particular RAID layout, such as

Q. Average time/task in the system, or the response time, which is the sum of Time queue and Time server is

Q. Data are allocated to disks in the RAID at the

Q. The area where the tasks accumulate, waiting to be serviced, is called the

Q. The Poisson distribution is described by the following equation (called the probability mass function):

Q. If interarrival times are exponentially distributed, the number ofarrivals in a time interval t is a

Q. The sum of entry time, system response time and think time is known as

Q. The average arrival rate of new tasks, and the average time to perform a task is: