Question

Cost and schedule are a part of

a.

Product Metrics

b.

Process Metrics

c.

Project Metrics

d.

None of the above

Posted under Software Engineering

Answer: (c).Project Metrics

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Cost and schedule are a part of

Similar Questions

Discover Related MCQs

Q. Number of errors found per person hours expended is an example of a

Q. Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors?

Q. The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio?

Q. Which of the following is not categorized under Component-Level Design Metrics?

Q. Percentage of modules that were inspected is a part of

Q. Identify the correct option with reference to Software Quality Metrics.

Q.  From the following methods which size of the software product can be calculated?

Q. To compute Function Point (FP) which of the following relationship is used? Where Fi = complexity adjustment values.

Q. Which core steps are defined by six sigma methodology?

Q. Which is a logical grouping of data that resides within the application’s boundary and it is maintained via external inputs?

Q. The evaluation of metrics resulting in insight and the quality of the representation is ___________ .

Q. Which of these terms are level names in the Capability Maturity Model?

Q. Which of these are standards for assessing software processes?

Q. For the same problem the code size in KLOC in various language can be best estimated at Assembly language: OO languages : icon based graphical language as

Q. For the same detailed design the size in KLOC in various language can best be described as estimates assembly language : C : icon based graphical language as

Q. Software compatibility means

Q. An annual budget amount reserved for systems implementations is considered a

Q. Performance, cost, reliability, technology, and ergonomics are examples of

Q. Maintenance, conversion, training and business position are examples. Select one answer

Q. Capability level in which all level 2 criteria have been achieved, process is tailored from organization's set of standard processes according to organization's tailoring guidelines and contributed work products ,measures and other process improvement information to organizational process assets in