How many numbers of maturity levels in CMM are available?

a.

3

b.

4

c.

5

d.

6

Posted under Software Engineering

Answer: (c).5

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. How many numbers of maturity levels in CMM are available?

Similar Questions

Discover Related MCQs

Q. Which of the following is the task of project indicators:

Q. Which of the following does not affect the software quality and organizational performance?

Q. The intent of project metrics is:

Q. Which of the following is not a direct measure of SE process?

Q. Which of the following is an indirect measure of product?

Q. In size oriented metrics, metrics are developed based on the ____________________.

Q. Which of the following is not an information domain required for determining function point in FPA ?

Q. Usability can be measured in terms of:

Q. A graphical technique for finding if changes and variation in metrics data are meaningful is known as

Q. Which metric gives the idea about the contents on a web page ?

Q. Number of dynamic web pages provides an idea about________ for a web page that is to be built.

Q. Which of the following web engineering metric measures the extent of relatedness between two or more web pages ?

Q. Which of the following is not a classification of the web engineering metric, Web Page Similarity ?

Q. Which of the following is not a web engineering project metric ?

Q. Which of the following is not a metric for design model?

Q. Statement and branch coverage metrics are part of

Q. Function Points in software engineering was first proposed by

Q. How many Information Domain Values are used for Function Point Computation?

Q. Function Point Computation is given by the formula

Q. Architectural Design Metrics are ___________ in nature.