adplus-dvertising
frame-decoration

Question

The final specifications are arrived at

a.

after feasibility study

b.

during feasibility study

c.

just before implementation phase

d.

when the system is being designed

Answer: (a).after feasibility study

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. The final specifications are arrived at

Similar Questions

Discover Related MCQs

Q. The main goal of arriving at a final specification is

Q. Final specifications are drawn up by

Q. Initial requirements specification is

Q. Feasibility study is carried out by

Q. It is necessary to carry out a feasibility study as

Q. The main objective of feasibility study is

Q. A feasibility study is carried out

Q. The instruction "If it's raining outside, then take an umbrella to work" is an example of the _____ structure,

Q. At the time of system study, flowcharts are drawn using

Q. Branch mark programs are best characterized as

Q. The feasibilities studied in preliminary investigation is (are):

Q. The recipe instruction "Beat until smooth' is an example of the _____ structure.

Q. Environment in systems parlance refers to

Q. Which of the following is not a characteristic of a system

Q. The background and experience of analyst include;

Q. Reverse video is a technique of

Q. A feasibility document should contain all of the following except :

Q. An appraisal, of a system's performance after it has been installed, is called system

Q. A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called

Q. A _____ is an outline of a process that keeps develop successful information systems