adplus-dvertising
frame-decoration

Question

A constraint on the state of the system before the use case can be executed is called a(n):

a.

trigger

b.

prior condition

c.

post condition

d.

none of the above

Answer: (d).none of the above

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. A constraint on the state of the system before the use case can be executed is called a(n):

Similar Questions

Discover Related MCQs

Q. A use case that captures the interactions between a user and the system free of technology and implementation detail is:

Q. The event that initiates the execute of the use case is called a(n):

Q. A use case consisting of steps extracted from a more complex use case in order to simplify the complex use case is called a(n):

Q. Mistakes made in the requirements analysis stage show up in

Q. A statement - by - statement description of a procedure is detailed in a;

Q. The analyst learns of the manager's information needs through use of

Q. All of the following tools are used for process descriptions except:

Q. Requirements also serve as an evaluation checklist at the end of the development project, so they are sometimes called _____.

Q. The major goal of requirement determination phase of information system development is

Q. It is necessary to prioritize information requirements of an organization at the requirements determination phase as

Q. Requirement specification is carried out

Q. The role of a system analyst drawing up a requirements specification is similar to

Q. It is necessary to consult the following while drawing up requirement specification

Q. In order to understand the working of an organization for which a computer based system is being designed, an analyst must

Q. During what phase, the requirement analysis is performed?

Q. Information requirements of an organization can be determined by

Q. The code is developed with the measurable properties of an item is known