adplus-dvertising
frame-decoration

Question

The most creative and challenging phase of system life cycle is

a.

Design

b.

Maintenance

c.

Feasibility study

d.

None of the above

Posted under Software Engineering

Answer: (a).Design

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. The most creative and challenging phase of system life cycle is

Similar Questions

Discover Related MCQs

Q. The advantages of creating a prototype are

Q. The main activity of the design phase of the system life cycle is to

Q. The main purpose of the system investigation phase is to produce

Q. A system analyst does not need to consider

Q. A feasibility study

Q. The combination of the top-down and the bottom-up approach may be referred to as an

Q. System prototyping helps the designer in

Q. Mistakes made in the system analysis stage show up in

Q. Which of the following is not true of the conversion phase of the development life cycle?

Q. Which of the following is not a factor in the failure of the systems development projects ?

Q. In phase 1 of the system development life cycle, which of the following aspects are usually analyzed?

Q. The feasibilities studied in preliminary investigation is (are)

Q. To which phase of SDLC, is file conversion related?

Q. Which of the following activities does not belong to the Implementation phase of the SDLC?

Q. A pseudocode is a/an

Q. An audit trial is

Q. In Concurrent Development Model, when end user indicates changes in requirements must be made, modeling activity moves from under development state into the

Q. In Concurrent Development Model, event generated in process network trigger transitions among the

Q. In Concurrent Development Model, for example when analysis model correction is generated, analysis action present in awaiting state moves into

Q. In Concurrent Development Model, for example when analysis model correction is not generated, analysis action is present in