adplus-dvertising
frame-decoration

Question

Which of the following is not considered a tool at system design phase ?

a.

Pie chart

b.

Decision table

c.

System flow chart

d.

Data flow diagram

Answer: (a).Pie chart

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which of the following is not considered a tool at system design phase ?

Similar Questions

Discover Related MCQs

Q. In a system design project hardware design starts from

Q. Which of the following is not a major design consideration of the system?

Q. The role of an integrated CASE tool in system analysis and design project is

Q. The database design activity deals with the design of

Q. System development is a

Q. A starting point in the design phase of a system design project is

Q. A zero level DFD describers

Q. Prototype is a

Q. Customers will not have trouble using a proposed system. Select the best it for answer :

Q. Your evaluation shows the benefits out weight costs for a proposed system. Select the best fit for answer :

Q. In object oriented design of software, objects have

Q. A graphic representation of an information system is called

Q. Top-down software design

Q. In top-down analysis and design

Q. Structured design methodology is an approach to design that adheres to rules based on principles such as

Q. Rapid prototyping proves the quality of a design by

Q. The design report should include

Q. A turnkey package includes

Q. Which of the following represents processor activities, methods and procedures in a data flow diagram?

Q. Structured design produces computer programs that are