adplus-dvertising
frame-decoration

Question

Which of the following costs is not part of the total effort cost?

a.

Costs of networking and communications

b.

Costs of providing heating and lighting office space

c.

Costs of lunch time food

d.

Costs of support staff

Posted under Software Engineering

Answer: (c).Costs of lunch time food

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. Which of the following costs is not part of the total effort cost?

Similar Questions

Discover Related MCQs

Q. What is related to the overall functionality of the delivered software?

Q. A _________ is developed using historical cost information that relates some software metric to the project cost.

Q. It is often difficult to estimate size at an early stage in a project when only a specification is available

Q. Which technique is applicable when other projects in the same analogy application domain have been completed?

Q. Which model assumes that systems are created from reusable components, scripting or database programming?

Q. Which of the following states that work expands to fill the time available.

Q. Which model is used during early stages of the system design after the requirements have been established?

Q. Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools?

Q. The COCOMO model takes into account different approaches to software development, reuse, etc.

Q. Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP?

Q. The empirical data that support most estimation models are derived from a vast sample of projects.

Q. Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established?

Q. Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount.

Q. Which one is not a size measure for software product?

Q. COCOMO was developed initially by

Q. Estimation of size for a project is dependent on

Q. COCOMO-II was developed at

Q. Which one is not a stage of COCOMO-II?

Q. Why is decomposition technique required?

Q. Cost and effort estimation of a software uses only one forms of decomposition, either decomposition of the problem or decomposition of the process.