In waterfall model, phases

a.

overlap

b.

are not linear

c.

are not sequential

d.

not overlap

Answer: (d).not overlap

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. In waterfall model, phases

Similar Questions

Discover Related MCQs

Q. Waterfall model phase which combines code generation and testing that is required to uncover errors in code is

Q. Waterfall model phase in which all possible requirements of system to be developed are captured and project initiate is

Q. Waterfall model is also known as

Q. Waterfall model phase which establishes a plan for software engineering work that follows i.e estimating, scheduling, tracking is

Q. Waterfall model phase in which modification of a software product is done after delivery to correct faults, to improve performance or other attributes is

Q. Oldest paradigm for software engineering is

Q. Model in which any phase in development process begins only if previous phase is complete is

Q. Waterfall model were originally proposed by

Q. Waterfall model phase in which system design is prepared and this system design helps in specifying system requirements and define overall system architecture is

Q. Which of the following are valid step in SDLC framework?

Q. Which of the following is the first step in SDLC framwork?

Q. Which of the following is not correct model in Software Development Paradigm?

Q. Waterfall model is not suitable for:

Q. In the maintenance phase the product must be tested against previous test cases. This is known as __________ testing.

Q. Which type of integration testing uses stubs?

Q. Which one of the following is a functional requirement?

Q. What is the main goal of a software development project according to traditional models?

Q. What are the advantages of using an explicit process modeling language in software development?

Q. What are the characteristics of projects that fit well with heavyweight methods?

Q. What are the characteristics of projects that fit well with lightweight methods?