adplus-dvertising
frame-decoration

Question

A simple notation for the representation of control flow.

a.

System flow

b.

Flow graph

c.

Flow program

d.

System program

Answer: (b).Flow graph

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. A simple notation for the representation of control flow.

Similar Questions

Discover Related MCQs

Q. A software metric that provides a quantitative measure of the logical complexity of a program.

Q. An expression for the calculation of cyclomatic complexity.

Q. The probability of failure-free operation of a software application in a specified environment for a specified time.

Q. SCM stands for __________

Q. ______________ is done in the development phase by the developers.

Q. Testing is conducted by the developers in testing phase.

Q. Process of evaluating a system to verify whether or not it is meeting its objectives.

Q. A point not considered in system evaluation.

Q. Incorporating changes in an existing system to enhance, update, or upgrade its features.

Q. _____________ Conducted at developer’s site.

Q. ___________ Conducted at customers’ site.

Q. The probability that a software application is operating according to requirements at a given point in time.

Q. A model that is the demo implementation of the system.

Q. Maintenance is the final phase in waterfall model.

Q. A stage in which individual components are integrated and ensured that they are error-free to meet customer requirements.

Q. ___________ is a step in which design is translated into machine-readable form.

Q. The customer requirements are broken down into logical modules for ease of _______________

Q. What do you call a technical person who is capable of understanding the basic requirements?

Q. A step in waterfall model that involves a meeting with the customer to understand the requirements.

Q. Methodology in which project management processes were step-by step.