_______ are applied throughout the software process.

a.

Framework activities

b.

Umbrella activities

c.

Planning activities

d.

Construction activities

Answer: (b).Umbrella activities

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. _______ are applied throughout the software process.

Similar Questions

Discover Related MCQs

Q. What is true about UML stereotypes ?

Q. Which one of the following is not a source code metric?

Q. To compute function points (FP), the following relationship is used FP = Count - total x (0.65 + 0.01 x  ∑(Fi))where Fi (i = 1 to n) are value adjustment factors (VAF) based on n questions. The value of n is

Q. Assume that the software team defines a project risk with 80% probability of occurrence of risk in the following manner:

Only 70 percent of the software components scheduled for reuse will be integrated into the application arid the remaining functionality will have to be custom developed: If 60 reusable components were planned with average component size as ' 100 LOC and software engineering cost for each LOC as $ 14, then the risk exposure would be

Q. Maximum possible value of reliability is

Q. 'FAN IN' of a component A is defined as

Q. Temporal cohesion means

Q. Match the following:

a. Good quality              i. Program does  not fail for a
                                               specified time in a given
                                               environment'
b. Correctness              ii. Meets the functional
                                               requirements
c. Predictable                iii. Meets both functional and
                                              non-functional requirements ,
d. Reliable                    iv.  Process is under statistical 
                                              control
 
Codes 
a   b   c  d

Q. Match the following 

List - I List - II

(a) Size-oriented metric (i) uses number of external interfaces as one of the measurement parameters

(b) Function-oriented metrics (ii) originally designed to be applied to business information system

(c) Extended Function Point Metrics (iii) derived by normalizing quality and/ or productivity measures by considering the size of the software.

(d) Function Point (iv) uses algorithm characteristics as of the measurement parameter

code:
(a)  (b)  (c)  (d)

Q. In which testing strategy requirements established during requirements analysis are validated against developed software?

Q. Which process model is also called as classic life cycle model?

Q. Cohesion is an extension of :

Q. Which one from the following is highly associated activity of project planning?

Q. Module design is used to maximize cohesion and minimize coupling. Which of the following is the key to implement this rule?

Q. Verification :

Q. Which design metric is used to measure the compactness of the program in terms of lines of code?

Q. Requirements prioritization and negotiation belongs to :

Q. Adaptive maintenance is a maintenance which ___________.

Q. A Design concept Refinement is a :

Q. A software design is highly modular if :