adplus-dvertising
frame-decoration

Question

In PSP model, code is generated, reviewed, compiled and tested by

a.

high level design review

b.

high level design

c.

planning

d.

development

Answer: (d).development

Engage with the Community - Add Your Comment

Confused About the Answer? Ask for Details Here.

Know the Explanation? Add it Here.

Q. In PSP model, code is generated, reviewed, compiled and tested by

Similar Questions

Discover Related MCQs

Q. External specifications for each component to be constructed are developed and component design is created in

Q. PSP activity isolate requirements and based on them; develops both size and resource estimates is

Q. In PSP , formal verification methods are applied to uncover errors in a design by

Q. In PSP model, issues regarding component design is recorded and tracked by framework activity which is

Q. Software process which emphasizes personal measurement of both work that is produced and resultant quality of work work product is

Q. Software process are adopted by

Q. When we work to build a product or system it is important to go through a series of predictable steps which provides a timely, high quality results. These steps are termed as

Q. A framework for tasks that are required to build high quality software is

Q. Programs, documents and data that are produced as a consequence of activities and tasks defined by process are called

Q. Framework activity which involves heavy communication and collaboration with customer and encompasses requirements gathering and other related activities is

Q. Engineering action encompasses a work task like architectural design, interface design etc that create a design model is termed as

Q. Activity which encompasses activities required to create work products such as model, documents, logs, forms and lists is

Q. Framework activity which combines code generation and testing that is required to uncover errors in code is

Q. Activity which manages effect of change throughout software process is

Q. Activity allow software team to assess progress against project plan and take necessary action to maintain schedule is

Q. Process models that emphasize project agility are termed as

Q. Collection of related tasks that produces a major software engineering work product is termed as

Q. Which of following activity can be used in conjunction with all framework and umbrella activities?

Q. Activity assesses risks that may effect outcomes of project or quality of product is

Q. Engineering action encompasses a set of work tasks that lead to creation of analysis model is